Engineering

The design work

What we are building and how far each piece has come. The numbers and drawings stay with the team and the judges until after launch day.

Technical information is confidentialShared with the Bahrain Space Agency review panel only. This page shows what we have worked on, not the details.
Confidential
StructureUnder way

Enclosure and layout

Layout chosen 8 Nov, CAD under way

MassDone

Mass budget and centre of mass

Itemised with the competition margins

RecoveryDone

Parachute sizing

Sized for the new design

PowerDone

Power budget

Average and peak, 3 hours plus margin

RadioDone

RF link budget

Margin worked out at launch range

SoftwareUnder way

Flight state machine

Arming, release detection and landing

PayloadUnder way

Camera and thermal integration

Parts chosen, fit check next

Kit auditDone

Kit documents review

Conflicts and faults raised with BSA

TestingNext

Test plan

Drop, pull, heat soak, range, 2-hour run

Reviewing PearlSat for the competition? Our full design is in the review packages submitted to BSA. Anyone else, get in touch.